From ongoing maintenance to playing pivotal roles on conception, design and installs, Merhone has the experience to see the job through.

Scenic World Skyway

Scenic World Skyway suspends some 270 metres above the valley floor as the largest aerial cablecar in the Southern Hemisphere. Merhone installed fail-safe and highly-automated safety-rated control systems within a five week timeframe with exceptional results.

Cleanaway South Windsor

For over ten years, Merhone has met the round-the-clock industrial electrical needs of Toxfree, now Cleanaway, South Windsor plant. Tasks as simple as lighting, to complex repower projects and PLC troubleshooting have been completed with the stringent quality and safety assurances required by such a facility.

Scenic World Skyway - Merhone

From design and install to maintenance or urgent
finding, Merhone offer a long list of services.